Code Browser
GitHub issues and pull requests across the indexed Cosmos repositories.
ItemTitleState
PR #5114
build(deps): Bump actions/checkout from 3 to 4
closed
PR #5113
build(deps): Bump github.com/hashicorp/go-metrics from 0.5.1 to 0.5.2
closed
IS #5112
Conditional clients
closed
IS #5111
ibc-go v8.0.0 package error
closed
PR #5110
Remove header from events
closed
PR #5109
Fix Upgrade Tests
closed
PR #5108
imp: remove `LatestSequenceSend`
closed
PR #5107
Rename codeid/codehash to checksum
closed
PR #5106
Remove static linking option from Makefile.
closed
PR #5105
Add an error-ing implementation for GoAPI.
closed
IS #5104
Check that code hash was not modified in migrate call
closed
PR #5103
imp: unpin contract in remove code hash
closed
PR #5102
imp: return `Unauthorised` if code hash is not stored
closed
PR #5101
imp: check response in instantiate and migrate from wasm vm calls
closed
PR #5100
add 08-wasm code owners
closed
IS #5099
Unpin contract in RemoveCodeHash.
closed
IS #5098
Add check if codeHash has been stored in Status call.
closed
IS #5097
Check response in Instantiate and Migrate from wasm VM calls.
closed
PR #5096
build(deps): Bump bufbuild/buf-setup-action from 1.27.2 to 1.28.0
closed
PR #5094
fix(statemachine)!: restore functionality to handle legacy upgrade proposals
closed
PR #5093
chore: propagate IBC authority to 04-channel keeper to be used within upgrade cancellation
closed
PR #5092
Run WASM E2E tests only when relevant changes are made
closed
PR #5091
deps(callbacks): remove local pin
closed
IS #5090
Run WASM E2E tests only when relevant changes are made
closed
IS #5089
Documentation for channel upgradability
closed
IS #5088
Allow usage of multiple wasm VMs
closed
IS #5087
Support upgrade tests in manual e2e simd workflow
closed
IS #5086
Consisten argument order in VM entrypoint wrappers
closed
PR #5085
chore: rebase 04-channel-upgrades feature branch
closed
IS #5084
Restructure 02-client to a more generalized light client handler
closed